Energy infrastructure development
The ground for
what comes next.
Envik develops sites for data centers and for high-power charging across the Nordic countries, bringing land, power and permits together into a project ready for construction.
What Envik develops
Two verticals.
One method.
Envik is a Nordic energy infrastructure developer, working in two verticals for Europe’s leading operators: data center sites and supercharging sites.
Each data center position is bought and carried on Envik’s own balance sheet, ahead of any buyer, and runs to the point where an operator can begin construction. The charging work came first: Envik ran charging sites as an operator before it developed them for others, so it has been the customer of the process it now runs.
The portfolio
Where power meets demand.
Capacity in the north, where the grid still has room to give it, and positions in the south, where the demand is and every connection is contested. The site below is ready to build.
Available now - SE2
Ready to build.
Room to grow.
Envik SE2-01 · Västernorrland
- Grid capacity
- 150 MW
- Site area
- 24 ha
- Earliest energization
- 2029
Consents in force and dated grid capacity. Project documentation is available to qualified counterparties under NDA.
Request the site packagePipeline capacity includes contracted capacity and applications. Development targets are distinct from secured power and remain subject to each project’s approvals and connection program.
What Envik brings together
Every workstream,
one contract.
Envik runs six workstreams on every data center site and holds all six in one contract. None is run in isolation: a grid answer changes the layout and a consent condition changes the earthworks, so each is run against the whole project.
Land origination
Land is screened against grid capacity, fiber routes, ground conditions and municipal planning intent before it is acquired.
Explore land originationGrid and power
Connection applications, capacity agreements and substation siting, taken to a firm offer with a named substation and a dated connection.
Explore grid and powerPermitting and planning
Zoning, environmental consents and impact assessment, taken to legally final decisions before handover, with the plan written so a building permit can follow the buyer’s own design.
Explore permitting and planningConnectivity
Physically diverse fiber routes, with route distances and the carriers’ latency figures to the Nordic and continental exchanges.
Explore connectivitySite enablement
Access roads, water, drainage, bulk earthworks and substation civils, completed before handover.
Explore site enablementHandover and RTB
Clean title, granted permits, executed grid agreements, surveys, models and warranties, transferred as one structured data room.
Explore handover and RTB
A connection is more than a point on a map.

Long-term responsibility
The site is part of a bigger place.
Energy, water, nature and the surrounding community shape a project from the outset.
Envik considers power supply, heat recovery, cooling and land use during development, while the choices that influence long-term impact are still open.
Insights
Perspectives from the ground.

A site for your
next project.
Share your capacity, location and timing, and Envik comes back with the positions that fit.

A future for
your land.
Find out what your land could carry: an initial look at grid access, planning and ground, at no cost.